AV Dawson New Deep Water Berth
Dredging of river bed down to 8m to allow bigger vessels to berth. The use of precast concrete units and steel tubular piles tied in with an insitu concrete deck for lifting operations. Design of new fender system to cope with larger vessels berthing.