Dredging of river bed down to 8m to allow bigger vessels to berth. The use of precast concrete units and steel tubular piles tied in with an insitu concrete deck for lifting operations. Design of new fender system to cope with larger vessels berthing.
Full re-development of Bulkhaul Headquarters from main office building to tank wash facilities in 8No. work packages.
Design of foundation on Johnson Matthey site for Sabic. Structural detailing, structural calculations, supervision of construction works.
Visual inspection including thickness testing of piles, full structural analysis of current loading capacity and recommendations for future loading operations.
Project Management services for the construction of the Intermodal Terminal. Contractors appointed were Owen Pugh Ltd.
A delamination survey was carried out by Simpson Coulson Limited (SCL) to identify the works required for repair
Identification of refurbishment works, tender review of contractors, Project Management services for the entire project.
Simpson Coulson Limited (SCL) were instructed by Camphill Village Trust (CVT) to carry out a design and build package for the construction of a new car park on their facility in Botton Village. The activities SCL carried out included earthworks, retaining wall design & construction, a footpath behind the retaining wall with all new surfaces […]
Design of a structural loading mat for the load out of wind turbine units such as towers and blades.
Annual structural inspection and repair services of Serco’s Fire Training Rig at their International Fire Training Centre (IFTC)